Kiru Hydro-Electric Power Project The Central Bureau of Inve | Study today ( UPSC prelims mains )
Kiru Hydro-Electric Power Project
The Central Bureau of Investigation recently searched 12 locations in Delhi and Rajasthan in connection with a case alleging corruption in the award of ₹2,200 crore civil works related to the Kiru hydro-electric power project.
About Kiru Hydro-Electric Power Project:
Location:
It is being developed over the Chenab River near the villages of Patharnakki and Kiru in Kishtwar district, Jammu and Kashmir (J&K).
It is located between Kirthai II hydroelectric project to its upstream and Kwar hydroelectric project to its downstream.
It is a 624MW run-of-river project.
The project is being developed by Chenab Valley Power Projects (CVPP), a joint venture between National Hydroelectric Power Corporation (NHPC, 49%), Jammu & Kashmir State Power Development Corporation (JKSPDC, 49%) and Power Trading Corporation (PTC, 2%).
Beneficiary States: J&K, Himachal Pradesh, Punjab, Haryana, Uttar Pradesh, Uttaranchal, Rajasthan, Union territories of Chandigarh & Delhi.
Power plant make-up:
The project involves the construction of a 135m-high concrete gravity dam near Kiru.
The project will have a catchment area of 10,225km², while the reservoir will be 6.5km-long and 1.03km² in area.
It will have one 700m-long horse-shoe shaped diversion tunnel with two openings to divert the flow of the river to enable the dam construction.
#prelims
@studytoday1